Shemara Refit LLP

Shemara Refit LLP

DESCRIPTION

Provision of Funnel, Dorade vents and Splash pool for the Refit of the 65M classic motor vessel Shemara.

CONSTRUCTION METHOD

MDF Plugs, Polyester moulds and Vinylester mouldings.

DATE OF PROJECT

April 2013 – April 2014

SPECIAL CONSIDERATIONS

Due to modern engines the vessel no longer required the funnel for its original purpose. This space was being utilised for radar equipment. The laminate had to be engineered and tested to ensure signals could still transmit from within the funnel.

OUTCOME

The vessel was successfully launched on Monday the 14th of April.